Quality oil for formwork and molds
The main function of the formwork oil is to ensure an easy and uniform separation of the formwork from the hardened material after the pouring process has been completed.
Read articleCiros allows you to quickly attach the formwork of vertical structures and supports the load up to 2 tons.
Chiros – clip to a fixture that allows you to quickly attach the formwork of vertical structures and supports the load up to 2 tons. Allows you to stop or significantly reduce the use of tightening screws, nuts for formwork and the clips. For convenience, it is recommended to use presser key for chiros.
Spring clip is easy to use, saves time during Assembly and disassembly of the formwork of foundations, monolithic belts, walls, columns and concrete stairs.
Advantages:
Recommendations for use:
For installation of spring clamp it is necessary to withdraw the ends of the rebar on the outside of formwork shield to a length of about 15 cm and tighten the retaining key for chiros. Upon completion of the work, removing chiros and dismantling of formwork is needed to cut the ends of the rebar.
Material |
Hardened steel |
Color |
Red |
The size of the plate |
105×72 mm |
The thickness of the plate |
3 mm |
The diameter of the used reinforcement |
6-10 mm |
Load |
2 t |
Weight |
0.3 kg |
The main function of the formwork oil is to ensure an easy and uniform separation of the formwork from the hardened material after the pouring process has been completed.
Read articleWhen choosing materials, one should take into account the type of foundation, its dimensions, loading, construction conditions and the duration of use of the formwork.
Read articleFoundation formwork plays a key role in ensuring the correct shape and geometry of the foundation and helps to ensure quality and sound construction.
Read article